Minimising the Cycle Time with Assembly Line Balancing and Worker Assignment: A Case Study in a Medical Device Manufacturer Company
Loading...

Date
2025
Journal Title
Journal ISSN
Volume Title
Publisher
ISRES Publishing
Open Access Color
GOLD
Green Open Access
No
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
In this research, we considered the mixed-model assembly line balancing and worker assignment problems of a medical device manufacturer in Türkiye. We combined these problems into a single integer programming model where multiple types of products can be assembled simultaneously on a single assembly line, and workers are assigned to workstations based on their abilities while ensuring the balance and efficiency of the assembly line. Our proposed approach seeks to minimise the cycle time and ability-based assignment costs on the assembly line. We used the Gurobi solver to find the optimal solution for the proposed problem. Our approach provides higher efficiency and results in a 76% increase in productivity without requiring additional work hours or workers. © 2025 Published by ISRES Publishing.
Description
Keywords
Assembly Line Balancing, Cycle Time Minimisation, Mixed-Model
Fields of Science
Citation
WoS Q
N/A
Scopus Q
N/A

OpenCitations Citation Count
N/A
Source
Eurasia Proceedings of Science, Technology, Engineering and Mathematics -- 7th International Conference on Research in Engineering, Technology and Science, ICRETS 2025 -- 2025-07-10 through 2025-07-13 -- Peja -- 343919
Volume
35
Issue
Start Page
133
End Page
139
Collections
PlumX Metrics
Citations
Scopus : 0
Google Scholar™


