Scopus İndeksli Yayınlar Koleksiyonu
Permanent URI for this collectionhttps://hdl.handle.net/20.500.12573/395
Browse
2 results
Search Results
Article Citation - WoS: 4Citation - Scopus: 8Model-Centric Distribution Automation: Capacity, Reliability, and Efficiency(Taylor & Francis inc, 2016-02-26) Onen, Ahmet; Jung, Jaesung; Dilek, Murat; Cheng, Danling; Broadwater, Robert P.; Scirbona, Charlie; Wang, XiaoyuA series of analyses along with field validations that evaluate efficiency, reliability, and capacity improvements of model-centric distribution automation are presented. With model-centric distribution automation, the same model is used from design to real-time control calculations. A 14-feeder system with 7 substations is considered. The analyses involve hourly time-varying loads and annual load growth factors. Phase balancing and capacitor redesign modifications are used to better prepare the system for distribution automation, where the designs are performed considering time-varying loads. Coordinated control of load tap changing transformers, line regulators, and switched capacitor banks is considered. In evaluating distribution automation versus traditional system design and operation, quasi-steady-state power flow analysis is used. In evaluating distribution automation performance for substation transformer failures, reconfiguration for restoration analysis is performed. In evaluating distribution automation for storm conditions, Monte Carlo simulations coupled with reconfiguration for restoration calculations are used. The evaluations demonstrate that model-centric distribution automation has positive effects on system efficiency, capacity, and reliability.Conference Object Citation - Scopus: 6Distribution Automation Effects on Reliability During Major Contingencies(IEEE Computer Society help@computer.org, 2018-05) Yoldaş, Yeliz; Onen, Ahmet; Alan, İrfan; Broadwater, Robert P.Distribution automation affects reliability by providing faster restoration ability. In this study, the effect of distribution automation on radial distribution circuits during substation failures at peak load is investigated. The ultimate goal is to compare circuit automation to manual operation, where the comparison evaluates planning criteria reliability for customer interruption hours. The results show that distribution automation can improve reliability measurements such as SAIDI, SAIFI and CAIDI. © 2018 Elsevier B.V., All rights reserved.
