WoS İndeksli Yayınlar Koleksiyonu
Permanent URI for this collectionhttps://hdl.handle.net/20.500.12573/394
Browse
2 results
Search Results
Article Citation - WoS: 112Citation - Scopus: 149Mitigation of Power Quality Problems Using Distribution Static Synchronous Compensator: A Comprehensive Review(Inst Engineering Technology-IET, 2015-07) Latran, Mohammed Barghi; Teke, Ahmet; Yoldas, YelizElectric power quality (PQ) in distribution system has become increasingly significant subject both for end users and power suppliers with the deregulation of the electric power market. The inadequate performance of conventional compensation devices to mitigate PQ problems has revealed the use of advanced power electronics based compensation devices. Distribution static synchronous compensator (DSTATCOM) is one of the shunt connected custom power devices used to improve PQ, voltage and reactive power support and to increase the capability of the auxiliary service for utility grid. This study presents a comprehensive review of the various DSTATCOM configurations for single-phase (two-wire) and three-phase (three or four-wire) systems and control strategies for the compensation of different PQ problems in distribution systems. In addition, comprehensive explanation, comparison and discussion on DSTATCOM technology are performed. Furthermore, latest trends, practical consideration and some future research fields on DSTATCOMs are discussed in detail. This is intended to present a broad perspective on the status of DSTATCOM technology to researchers dealing with compensation of PQ problems in distribution systems.Article Implementation of Capital Deferral Algorithm in Real Distribution Systems Considering Reliability by Managing Major Faults(Springer, 2019-10-15) Yoldas, Yeliz; Onen, Ahmet; Broadwater, Robert; Alan, IrfanDistribution automation technology plays a key role on power system reliability by providing faster detection, isolating the faulted area and restoring the fault. In this paper, the impacts of distribution automation are considered on radial distribution system in the event of substation transformer bank malfunction at maximum load level with the aim of deferring the big capital investments. The aim of the proposed method is not only to increase physical impact such as the reliability but also to monetize physical measures into significant economic benefits by deferring the overall investment costs. The proposed algorithm is tested with the real distribution system data, and it is shown that it can obtain remarkable economic benefits by deferring the larger capital equipment investments by making smaller investments in distribution automation.
