Implementation of capital deferral algorithm in real distribution systems considering reliability by managing major faults

dc.contributor.author Yoldas, Yeliz
dc.contributor.author Onen, Ahmet
dc.contributor.author Broadwater, Robert
dc.contributor.author Alan, Irfan
dc.contributor.department AGÜ, Mühendislik Fakültesi, Elektrik - Elektronik Mühendisliği Bölümü en_US
dc.date.accessioned 2021-03-11T12:49:01Z
dc.date.available 2021-03-11T12:49:01Z
dc.date.issued 2019 en_US
dc.description.abstract Distribution automation technology plays a key role on power system reliability by providing faster detection, isolating the faulted area and restoring the fault. In this paper, the impacts of distribution automation are considered on radial distribution system in the event of substation transformer bank malfunction at maximum load level with the aim of deferring the big capital investments. The aim of the proposed method is not only to increase physical impact such as the reliability but also to monetize physical measures into significant economic benefits by deferring the overall investment costs. The proposed algorithm is tested with the real distribution system data, and it is shown that it can obtain remarkable economic benefits by deferring the larger capital equipment investments by making smaller investments in distribution automation. en_US
dc.identifier.endpage 1102 en_US
dc.identifier.issn 0948-7921
dc.identifier.issn 1432-0487
dc.identifier.issue 4 en_US
dc.identifier.startpage 1095 en_US
dc.identifier.uri https://doi.org/10.1007/s00202-019-00849-y
dc.identifier.uri https://hdl.handle.net/20.500.12573/584
dc.identifier.volume Volume: 101 en_US
dc.language.iso eng en_US
dc.publisher SPRINGER, ONE NEW YORK PLAZA, SUITE 4600, NEW YORK, NY, UNITED STATES en_US
dc.relation.isversionof 10.1007/s00202-019-00849-y en_US
dc.relation.journal ELECTRICAL ENGINEERING en_US
dc.relation.publicationcategory Makale - Uluslararası - Editör Denetimli Dergi en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject System reconfiguration en_US
dc.subject Smart grid investments en_US
dc.subject Smart grid economy en_US
dc.subject Capital deferral en_US
dc.title Implementation of capital deferral algorithm in real distribution systems considering reliability by managing major faults en_US
dc.type article en_US

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Implementation of capital deferral algorithm in real distribution systems considering reliability by managing major faults.pdf
Size:
1016.41 KB
Format:
Adobe Portable Document Format
Description:
Makale Dosyası

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.44 KB
Format:
Item-specific license agreed upon to submission
Description: